|
|
|
|
LEADER |
00963cam a2200241 7i4500 |
001 |
0000005427 |
005 |
20231108090000.0 |
002 |
000005458 |
020 |
0 |
0 |
|a 0408026308 (pbk.)
|
090 |
0 |
0 |
|a HD47
|b .P76 1988
|
245 |
0 |
0 |
|a Project cost databanks
|b working party report
|c Association of Project Managers in conjunction with DHSS, Directorate of Works Construction Cost Intelligence ; edited by Peter F. Miller.
|
260 |
0 |
0 |
|a London
|b Butterworths
|c 1988
|
300 |
|
|
|a 108 p.
|b ill.
|c 21 cm.
|
500 |
|
|
|a Includes index
|
650 |
0 |
0 |
|a Costs, Industrial
|x Databases.
|
650 |
0 |
0 |
|a Industrial development projects
|x Costs
|x Data processing.
|
650 |
0 |
0 |
|a Project management
|x Data processing
|
650 |
0 |
0 |
|a Cost control
|x Data processing
|
700 |
1 |
0 |
|a Miller, Peter F.
|
710 |
2 |
0 |
|a Great Britain.
|b Directorate of Works Construction Cost Intelligence.
|
710 |
2 |
0 |
|a Association of Project Managers (Great Britain)
|
999 |
|
|
|a 10498
|
999 |
|
|
|a 10498
|b Book
|c General Collection
|e JKR Library
|