Central Spans Sructural Design Calculation Proposed Kapar Interchange-North Klang straits Bypass

Corporate Author: Malaysia Jabatan Kerja Raya
Published: Kuala Lumpur Perunding Bakti Sdn.Bhd. 1988
Subjects:
LEADER 00568cam a2200133 7i4500
001 0000012281
005 20151126090000.0
090 0 0 |a F RJ00115 
110 1 0 |a Malaysia  |b Jabatan Kerja Raya 
245 1 1 |a Central Spans Sructural Design Calculation  |b Proposed Kapar Interchange-North Klang straits Bypass  |b Diaphragm and Voided Bridge Deck Slab  |b Pier and Pile Cap (Pier 7 & 8 ) (Pier 6 to pier 9) 
260 0 0 |a Kuala Lumpur  |b Perunding Bakti Sdn.Bhd.  |c 1988 
300 |a Various Pages  |b Tables  |c 29cm 
650 0 0 |a Report 
999 |a F RJ00115  |b Document Contract  |c JKR Publication  |e Unit Rekabentuk Jalan