2nd Interim report Detailed Ground Survey and Engineering Design for Jalan Masuk ke Gugusan Felda Terapai,Pahang Darul Makmur
Corporate Author: | |
---|---|
Published: |
Kuala Lumpur
Berakan Jurutera Perunding Sdn Bhd
1987
|
Subjects: |
LEADER | 00512cam a2200133 7i4500 | ||
---|---|---|---|
001 | 0000013441 | ||
005 | 20151126090000.0 | ||
090 | 0 | 0 | |a I R00020 |
110 | 1 | 0 | |a Malaysia |b Jabatan Kerja Raya |
245 | 1 | 1 | |a 2nd Interim report |b Detailed Ground Survey and Engineering Design for Jalan Masuk ke Gugusan Felda Terapai,Pahang Darul Makmur |
260 | 0 | 0 | |a Kuala Lumpur |b Berakan Jurutera Perunding Sdn Bhd |c 1987 |
300 | |a various pages |b maps |c 29cm | ||
650 | 0 | 0 | |a Report |
999 | |a I R00020 |b Document Contract |c JKR Publication |e Unit Rekabentuk Jalan |