(1978). Interim Report: Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B). Kuala Lumpur: Stanley Consultant Malaysia Sdn Bhd.
Chicago Style CitationInterim Report: Detailed Ground Survey and Engineering Design for Road Improvement From M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B). Kuala Lumpur: Stanley Consultant Malaysia Sdn Bhd, 1978.
MLA CitationInterim Report: Detailed Ground Survey and Engineering Design for Road Improvement From M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B). Kuala Lumpur: Stanley Consultant Malaysia Sdn Bhd, 1978.
Warning: These citations may not always be 100% accurate.