Interim Report Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B)
Corporate Author: | Malaysia Jabatan Kerja Raya |
---|---|
Published: |
Kuala Lumpur
Stanley Consultant Malaysia Sdn Bhd
1978
|
Subjects: |
Similar Items
-
Interim Report Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B)
Published: (1978) -
Report Soil investigation for the improvement of Melaka-Lubuk Cina road from M.S7.5-M.S.13 and from M.S.19.25 to M.S.24 Melaka
Published: (1982) -
Report On Feasibility Study for The Upgrading of Johor Bahru-Kota Tinggi Road Package A:M.s13.0-M.s.25.5 Package B:M.s.25.5-M.s.38.0
Published: (1986) - Improvement of Existing Kuantan -Gambang Road To Dual Carriageway From M.s.0.25 to m.s12.5, Pahang Darul Makmur
-
Report On Feasibility Study for The Upgrading of Johor Bahru-Kota Tinggi Road Package A:M.s13.0-M.s.25.5 Package B:M.s.25.5-M.s.38.0
Published: (1986)