Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Accession No
Control No
Find
Advanced
Report on additional Soil Inve...
Description
Cite this
Email this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
Report on additional Soil Investigation for Proposed Improvement to Existing Route I Alor Setar- Butterworth.
Corporate Author:
Malaysia Jabatan Kerja Raya
Published:
Selangor
Wan Mohammed and Khoo sdn Bhd
1982
Holdings
Description
Preview
Similar Items
Staff View
Item Description:
(M.s 27 - 35 and M.s 37.5 - 45)
Physical Description:
various pagesIbmaps 29 cm
Similar Items
Additional Soil Investigation report for Project Jalan Lingkaran Tengah II Kuala Lumpur( Pakej 3)Ib Lay out for Bridge 1,2,3,&4
Published: (1996)
Additional Soil Investigation report for Project Jalan Lingkaran Tengah II Kuala Lumpur( Pakej 3)Ib Lay out for Bridge 1,2,3,&4
Published: (1996)
Proposed Improvement to the Existing Route I,Alor setar - Butterworth road (M.s 27 - 35 and M.s 37 .5 - 45)
Published: (1981)
Proposed Improvement to the Existing Route I,Alor setar - Butterworth road (M.s 27 - 35 and M.s 37 .5 - 45)
Published: (1981)
Soil Investigation Report for The Proposed Sungai - Buloh -Batu Tiga Road Selangor Route Section II
Published: (1983)
×
Loading...