Report on additional Soil Investigation for Proposed Improvement to Existing Route I Alor Setar- Butterworth.
Corporate Author: | Malaysia Jabatan Kerja Raya |
---|---|
Published: |
Selangor
Wan Mohammed and Khoo sdn Bhd
1982
|
Similar Items
-
Additional Soil Investigation report for Project Jalan Lingkaran Tengah II Kuala Lumpur( Pakej 3)Ib Lay out for Bridge 1,2,3,&4
Published: (1996) -
Additional Soil Investigation report for Project Jalan Lingkaran Tengah II Kuala Lumpur( Pakej 3)Ib Lay out for Bridge 1,2,3,&4
Published: (1996) -
Proposed Improvement to the Existing Route I,Alor setar - Butterworth road (M.s 27 - 35 and M.s 37 .5 - 45)
Published: (1981) -
Proposed Improvement to the Existing Route I,Alor setar - Butterworth road (M.s 27 - 35 and M.s 37 .5 - 45)
Published: (1981) -
Soil Investigation Report for The Proposed Sungai - Buloh -Batu Tiga Road Selangor Route Section II
Published: (1983)