APA Citation

(1988). Interim Report: Detailed Engineering Design For The Remedial Works To Slopes And Other Related Works Along The East-West Highway. Kuala Lumpur: Zaidun-Leeng Sdn.Bhd.

Chicago Style Citation

Interim Report: Detailed Engineering Design For The Remedial Works To Slopes And Other Related Works Along The East-West Highway. Kuala Lumpur: Zaidun-Leeng Sdn.Bhd, 1988.

MLA Citation

Interim Report: Detailed Engineering Design For The Remedial Works To Slopes And Other Related Works Along The East-West Highway. Kuala Lumpur: Zaidun-Leeng Sdn.Bhd, 1988.

Warning: These citations may not always be 100% accurate.