Interim Report Detailed Engineering Design For The Remedial Works To Slopes And Other Related Works Along The East-West Highway
Corporate Author: | |
---|---|
Published: |
Kuala Lumpur
Zaidun-Leeng Sdn.Bhd
1988
|
Subjects: |
LEADER | 00514cam a2200133 7i4500 | ||
---|---|---|---|
001 | 0000013596 | ||
005 | 20151126090000.0 | ||
090 | 0 | 0 | |a I R00061 |
110 | 1 | 0 | |a Malaysia |b Jabatan Kerja Raya |
245 | 1 | 1 | |a Interim Report |b Detailed Engineering Design For The Remedial Works To Slopes And Other Related Works Along The East-West Highway |
260 | 0 | 0 | |a Kuala Lumpur |b Zaidun-Leeng Sdn.Bhd |c 1988 |
300 | |a Various pages |b Technical Drawings |c 29cm | ||
650 | 0 | 0 | |a Report |
999 | |a I R00061 |b Document Contract |c JKR Publication |e Unit Rekabentuk Jalan |