Interim Report Route Location And Feasibility Study

Corporate Authors: Malaysia Jabatan Kerja Raya, Enex Project 580 Group Wilbur Smith and Associates,Inc..
Published: Kuala Lumpur Jurutera Konsultant (S.F.A) Sdn.Bhd 1979
Subjects:
LEADER 00594cam a2200145 7i4500
001 0000013602
005 20151126090000.0
090 0 0 |a I R00062 
110 1 0 |a Malaysia  |b Jabatan Kerja Raya 
245 1 1 |a Interim Report  |b Route Location And Feasibility Study  |b Highway Looking Towns Of Gua Musang,Kuala Lipis,Raub and Bentong  |b Economic Eppendicies 
260 0 0 |a Kuala Lumpur  |b Jurutera Konsultant (S.F.A) Sdn.Bhd  |c 1979 
300 |a Various pages  |c 29cm 
650 0 0 |a Report 
710 2 1 |a Enex Project 580 Group Wilbur Smith and Associates,Inc.. 
999 |a I R00062  |b Document Contract  |c JKR Publication  |e Unit Rekabentuk Jalan