Justification For Upgrading Jalan Kepong To Six Lanes Dual Carriageway
Corporate Author: | |
---|---|
Published: |
Kuala Lumpur
Jabatan Kerja Raya
1984
|
Subjects: |
LEADER | 00458cam a2200133 7i4500 | ||
---|---|---|---|
001 | 0000016348 | ||
005 | 20151126090000.0 | ||
090 | 0 | 0 | |a H PU00022 |
110 | 1 | 0 | |a Malaysia |b Jabatan Kerja Raya |
245 | 1 | 1 | |a Justification For Upgrading Jalan Kepong To Six Lanes Dual Carriageway |
260 | 0 | 0 | |a Kuala Lumpur |b Jabatan Kerja Raya |c 1984 |
300 | |a 28p. |b Technical Drawings |c 29cm | ||
650 | 0 | 0 | |a HPU (Traffic Volume ) |x Road |
999 | |a URJ07032 |b Book |c General Collection |e Unit Rekabentuk Jalan |