Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Accession No
Control No
Find
Advanced
Ground-Data processing before...
Description
Cite this
Email this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
Ground-Data processing before optimization of the vertical alignment:program Perlude
Corporate Author:
Transport and Road Research Laboratory
Other Authors:
Chard,M.E
Published:
London
TRRL
1972
Subjects:
Transport and Road Research Laboratory
>
Vertical alignment
Holdings
Description
Preview
Similar Items
Staff View
Item Description:
TRRL Report LR459
Physical Description:
Various Pages Tables 29cm
Similar Items
Ground-Data processing before optimization of the vertical alignment:program Perlude
Published: (1972)
Optimizing highway vertical alignments to minimize construction costs:program Minerva
Published: (1972)
Optimizing highway vertical alignments to minimize construction costs:program Minerva
Published: (1972)
British Standard Code Of Practice For Design Of Non-Loadbearing External Vertical Enclosures Of Buildings BSI 1985
Published: (1985)
Ground Engineering using Prefabricated Vertical Drains: A Review
by: Sakleshpur, Venkata Abhishek, et al.
×
Loading...