Settlement behind bridge abutments The performance of a medium-clay fill used to from the approach embankments to bridge on the M.1 motorway
Corporate Author: | Transport and Road Research Laboratory |
---|---|
Other Authors: | McLaren,D |
Published: |
London
RRL
1967
|
Subjects: |
Similar Items
-
Settlement behind bridge abutments The performance of a medium-clay fill used to from the approach embankments to bridge on the M.1 motorway
Published: (1967) -
Bridge rehabilitation and strengthening
Published: (1983) -
Two-dimensional analysis of settlement by computer program
Published: (1974) -
Overseas Road Note 7 A guide to bridge inspection and data systems for district engineers
Published: (1988) -
Bridge maintenance
Published: (1984)