Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Accession No
Control No
Find
Advanced
Kerja-Kerja Ukur Package II-Pr...
Preview
Cite this
Email this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
Kerja-Kerja Ukur Package II-Project Detailed Engineering Design For The Remedial Works To Slopes and Other Related Works Along East-West Highway : PKR (J) Rb 75/39-D SJ.IR :
Corporate Author:
Malaysia. Jabatan Kerja Raya
Published:
Kuala Lumpur:
Jabatan Kerja Raya Malaysia,
1987.
Subjects:
Agreement --
>
Kerja ukur
Malaysia
Holdings
Description
Preview
Similar Items
Staff View
Similar Items
Kerja-Kerja Ukur Package II-Project Detailed Engineering Design For The Remedial Works To Slopes and Other Related Works Along East-West Highway PKR (J) Rb 75/39-D SJ.IR JKR/PJR/29/87
Published: (1987)
Slope Remedial Works in Malaysia Cawangan Kejuruteraan Cerun
Published: (2019)
Kerja-Kerja Ukur Memperelokkan Jalan Johor Bahru Kota Tinggi-Package 2 M.S.5 3/4-M.S 8 1/2 Johor Darul Takzim PKR ( J ) RB.P.15.B.SJ.IV JKR/PJR/21/89
Kerja-Kerja Ukur Memperelokkan Jalan Johor Bahru Kota Tinggi-Package 2 M.S.5 3/4-M.S 8 1/2 Johor Darul Takzim PKR ( J ) RB.P.15.B.SJ.IV JKR/PJR/21/89
Soils compaction quality control work along the east west highway (Grik end) the analysis, interpretation and presentation on test Ho Sin Soon
by: Soon
×
Loading...