Interim Report Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B)

Corporate Author: Malaysia Jabatan Kerja Raya
Published: Kuala Lumpur Stanley Consultant Malaysia Sdn Bhd 1978
Subjects:
LEADER 00550cam a2200133 7i4500
001 0000018148
005 20151126090000.0
090 0 0 |a I R00037 
110 1 0 |a Malaysia  |b Jabatan Kerja Raya 
245 1 1 |a Interim Report  |b Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B) 
260 0 0 |a Kuala Lumpur  |b Stanley Consultant Malaysia Sdn Bhd  |c 1978 
300 |a various pages  |b maps,technical drawings  |c 29cm 
650 0 0 |a Report  |x Interim 
999 |a URJ04431  |b Book  |c Standards  |e Unit Rekabentuk Jalan