Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Accession No
Control No
Find
Advanced
Interim Report
Holdings
Cite this
Email this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
Interim Report Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B)
Corporate Author:
Malaysia Jabatan Kerja Raya
Published:
Kuala Lumpur
Stanley Consultant Malaysia Sdn Bhd
1978
Subjects:
Report
>
Interim
Holdings
Description
Preview
Similar Items
Staff View
Unit Rekabentuk Jalan
Call Number:
I R00037
Accession
Item Category
Format
Status
Notes
URJ04431
Standards
Book
Available
Similar Items
Interim Report Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B)
Published: (1978)
1st Interim Report Detailed Ground Survey and Engineering Design for Jalan Masuk ke Gugusan Felda Terapai,Pahang Darul Makmur
Published: (1987)
3rd Interim Report Detailed Ground Survey and Engineering Design for Jalan Masuk ke Gugusan Felda Terapai,Pahang Darul Makmur
Published: (1987)
2nd Interim report Detailed Ground Survey and Engineering Design for Jalan Masuk ke Gugusan Felda Terapai,Pahang Darul Makmur
Published: (1987)
Interim Report Naik taraf laluan 3,km 11-18,Jalan Kuala Terengganu-Marang,Terengganu
Published: (1998)
×
Loading...