Interim Report Detailed ground survey and Engineering Design for Road Improvement from M.S. 83.00 to M.S 87.62-Jalan Kuala Terengganu/Kuantan (package B)

Corporate Author: Malaysia Jabatan Kerja Raya
Published: Kuala Lumpur Stanley Consultant Malaysia Sdn Bhd 1978
Subjects:

Unit Rekabentuk Jalan

Call Number: I R00037
Accession Item Category Format Status Notes
URJ04431 Standards Book Available