Bridge Design Calculations Jalan Raya Timur-Barat Fasa (II) Seksyen Barat ( Pakej IV ) Dari Grik ke Kupang, Design 01 25 m 116 Precast Post-Tensioned Beam

Corporate Author: Malaysia Jabatan Kerja Raya
Published: Kuala Lumpur Minconsult Sdn Bhd 1996
Series:Vol 15
Subjects:
LEADER 00590cam a2200157 7i4500
001 0000019047
005 20151126090000.0
090 0 0 |a J CB00014 
110 1 0 |a Malaysia  |b Jabatan Kerja Raya 
245 1 1 |a Bridge Design Calculations  |b Jalan Raya Timur-Barat Fasa (II) Seksyen Barat ( Pakej IV ) Dari Grik ke Kupang, Design 01 25 m 116 Precast Post-Tensioned Beam 
260 0 0 |a Kuala Lumpur  |b Minconsult Sdn Bhd  |c 1996 
300 |a Various page  |b Table  |c 29cm 
440 0 0 |a Vol 15 
650 0 0 |a Design Calculations  |x Bridge 
651 0 0 |a Lebuh raya timur barat 
999 |a URJ03078  |b Book  |c Standards  |e Unit Rekabentuk Jalan