Cadangan Jalan Raya Simpang Pulai-Lojing Gua Musang-Kuala Berang Pakej 3 : Lojing ke Pos Blau Girder Slab Bridges Superstructure

Corporate Author: Malaysia Jabatan Kerja Raya
Published: Selangor HSS Intergrated Sdn Bhd 1994
Series:Vol 8
Subjects:
LEADER 00716cam a2200169 7i4500
001 0000019057
005 20151126090000.0
090 0 0 |a J CB00023 
110 1 0 |a Malaysia  |b Jabatan Kerja Raya 
245 1 1 |a Cadangan Jalan Raya  |b Simpang Pulai-Lojing Gua Musang-Kuala Berang Pakej 3 : Lojing ke Pos Blau Girder Slab Bridges Superstructure 
260 0 0 |a Selangor  |b HSS Intergrated Sdn Bhd  |c 1994 
300 |a Various pages  |c 29cm 
440 0 0 |a Vol 8 
500 0 0 |a  ( Straight In Plan ) Viaduct VI, Bridge B3, B2A ( Package 3/1 ) Bridges B1, B2, B3 ( Package 3/2 ) Design of Precast post Tensioned Girder 
650 0 0 |a Design Calculations  |x Cadangan 
651 0 0 |a Lebuh raya timur barat 
999 |a URJ07421  |b Book  |c Standards  |e Unit Rekabentuk Jalan