Skip to content
Toggle navigation
VuFind
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Accession No
Control No
Find
Advanced
Detailed discriminant analysis...
Description
Cite this
Email this
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Export to MARC
Export to MARCXML
Detailed discriminant analysis January 1995 for Pemulihan Lebuh Raya Timur Barat highway long term preventive measures and stability study.
Corporate Author:
Jurutera Perunding Zaaba.
Subjects:
Highways
Holdings
Description
Preview
Similar Items
Staff View
Physical Description:
1995
Similar Items
Listing of ranked prelimanary risk ratings for pemulihan lebuh raya timur-barat, east-west highway long term preventive measures and stability study
Published: (1995)
Pemulihan Lebuhraya Timur-Barat (East-West Highway Longterm Preventive Measures and Stability Study detailed discriminant analysis - January 1995
Published: (1995)
Pemulihan Lebuhraya Timur-Barat (East-West Highway Longterm Preventive Measures and Stability Study final risk analysis report
Published: (1996)
Pemulihan Lebuhraya Timur-Barat (East-West Highway Longterm Preventive Measures and Stability Study slope maintenance system (SMS) - operation manual
Published: (1997)
Pemulihan Lebuhraya Timur-Barat (East-West Highway Longterm Preventive Measures and Stability Study final risk maps June 1996 Rev. 1
Published: (1996)
×
Loading...
Loading...