Use of network techniques in project management Part 4. Guide to resource analysis and cost control
Provides guidance on the use of these two techniques as a natural extension of the use of time analysis as a means of improving the management of projects.
Corporate Author: | |
---|---|
Language: | English |
Published: |
London
BSI
1981
|
Subjects: |
Warning: pg_connect(): Unable to connect to PostgreSQL server: could not connect to server: Connection refused (0x0000274D/10061) Is the server running on host "10.8.80.113" and accepting TCP/IP connections on port 5432? in C:\SEAL\vufind\module\VuFind\src\VuFind\ILS\Driver\ILMU.php on line 116
Warning: pg_query() expects parameter 1 to be resource, boolean given in C:\SEAL\vufind\module\VuFind\src\VuFind\ILS\Driver\ILMU.php on line 141
Warning: pg_last_error() expects parameter 1 to be resource, boolean given in C:\SEAL\vufind\module\VuFind\src\VuFind\ILS\Driver\ILMU.php on line 143