Short-circuit currents in three-phase a.c. systems Part 4. Examples for the calculation of short-circuit currents

Short-circuit currents, Fault currents, Three-phase current, Alternating current, Electric current, Electrical installations, Electrical components, Electrical equipment, Mathematical calculations, Error correction, Electrical impedance

Corporate Author: International Electrotechnical Commission
Published: Switzerland IEC 2000
Subjects:

Warning: pg_connect(): Unable to connect to PostgreSQL server: could not connect to server: Connection refused (0x0000274D/10061) Is the server running on host "10.8.80.113" and accepting TCP/IP connections on port 5432? in C:\SEAL\vufind\module\VuFind\src\VuFind\ILS\Driver\ILMU.php on line 116

Warning: pg_query() expects parameter 1 to be resource, boolean given in C:\SEAL\vufind\module\VuFind\src\VuFind\ILS\Driver\ILMU.php on line 141

Warning: pg_last_error() expects parameter 1 to be resource, boolean given in C:\SEAL\vufind\module\VuFind\src\VuFind\ILS\Driver\ILMU.php on line 143