|
|
|
|
LEADER |
01088cam a2200193 7i4500 |
001 |
0000034685 |
005 |
20160217090000.0 |
008 |
160217 my eng |
090 |
0 |
0 |
|a MS 2526 : Part 4 : 2014
|
110 |
2 |
0 |
|a Department Of Standards Malaysia
|
245 |
1 |
0 |
|a Urban stormwater management :
|b Part 4. Roof and property drainage.
|
260 |
|
|
|a Shah Alam:
|b Department of Standard Malaysia,
|c 2014.
|
300 |
|
|
|a v, 11 pages:
|b illustratons;
|c 30 cm.
|
500 |
|
|
|a Status: Current
|
520 |
|
|
|a This Malaysian Standard specifies design and planning criteria for roof and property drainage. The criteria for roof drainage specify component sizes to avoid clogging and the risk of water entering the building. The criteria for property and drainage specify design storms to be catered to avoid hazards to people and damage to property. It does not deal with stormwater quality control
|
650 |
|
0 |
|a Urban runoff --
|x Management --
|x Standards --
|z Malaysia
|
650 |
|
0 |
|a Roof drainage --
|x Standards --
|z Malaysia
|
999 |
|
|
|a MS828
|
999 |
|
|
|a MS828
|b Malaysian Standard
|c Standards
|e JKR Library
|