Construction scheduling preparation, liability, and claims

Main Authors: Wickwire, Jon M (Author), Driscoll, Thomas J (Author), Hurlbut, Stephen B 1955 (Author), Groff, Mark J 1957 (Author)
Language:English
Edition:Fourth edition
Subjects:
LEADER 01897cam a2200301 7i4500
001 0000037285
005 20211124090000.0
008 211123s may eng
020 |a 9781543801408 
040 |a DLC  |b eng  |c DLC  |d JKR  |e rda 
090 0 0 |a KF902  |b W55 2019 
100 1 |a Wickwire, Jon M  |e author 
245 1 0 |a Construction scheduling  |b preparation, liability, and claims  |c Jon M. Wickwire, Thomas J. Driscoll,Stephen B. Hurlbut, Mark J. Groff 
250 |a Fourth edition 
264 0 |a New York  |b Wolters Kluwer  |c 2019 
300 |a 1 volume (various pagings)  |b illustrations  |c 26 cm 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
500 |a Includes bibliographical references and index 
505 0 |a Legal significance of the project schedule -- Scheduling methods used today -- Developing and maintaining the project schedule -- Legal aspects of schedule specifications -- Rights and obligations in scheduling -- Project record-keeping -- Time-related clauses and claims -- Time impact analysis procedures -- Applying CPM techniques to contract claims -- Standards of proof for contractor time delay claims -- Bilateral modifications settling time issues and bilateral startover schedules -- Calculating contractor's damages for delay, disruption, and loss of efficiency -- Calculating owner's damages for delay -- Investigating, preparing, presenting, and defending claims -- Legal decisions affecting expert's - expert's role in preparing and defending schedule claims 
650 0 |a Construction industry  |x Law and legislation  |z United States 
650 0 |a Production scheduling  |z United States 
650 0 |a Construction contracts  |z United States 
700 1 |a Driscoll, Thomas J  |e author 
700 1 |a Hurlbut, Stephen B  |d 1955  |e author 
700 1 |a Groff, Mark J  |d 1957  |e author 
999 |a 19087  |b Book  |c General Collection  |e JKR Library